Referentsid

The Squaire, Frankfurt, Germany

Up to 7,000 people work in the building's 'New York City'. The floor space is used by offices, hotels, the food service industry and retailers. The building's primary tenants are the audit firm KPMG, Lufhansa and two Hilton hotels. 

This building in the shape of a stylised train acts as the roof of the long-distance railway station at Frankfurt Airport. THE SQUAIRE is directly connected to Terminal 1 by a connecting passage. It is right by the A3 autobahn and is therefore one of the most accessible places in Germany. 

Teenused

  • Projekti täideviimine

Süsteemid ja komponendid

  • Elekter 
  • Turvatehnika 
  • Küte, vesi ja kanalisatsioon
  • Ventilatsiooni- ja kliimaseadmed
  • Automaatika 

Kliendigrupid

  • Kinnisvarainvestorid ja kinnisvaraarendajad

Kasutusala

  • Hotel
  • Flughafen/Bahnhof
  • Einkaufszentrum
  • Gastronomie
  • Büro/Verwaltung

Challenge

Heating, cooling, ventilation, sanitary, air conditioning, sprinklers, electric, instrumentation, control and automation combined with ambitious architecture and high logistic requirements

Solution

  • It is one of the biggest orders placed in the history of the company. Caverion employed up to 1,000 workers in a three-shift system for a period of approx. 24 months.
  • As the project's technical general contractor, Caverion was responsible for the heating and cooling, sanitation, sprinklers, ventilation and air-conditioning technology, the electrics, and instrumentation and control engineering.
  • Numerous measures were incorporated to boost the building's energy efficiency, including highly efficient heat recovery, hybrid recooling systems and highly efficient turbo chillers.The building makes use of rainwater.
  • Contract value approx. 200 million €
  • Years

    2008-2011

    Facts about the building

  • Gold LEED certificate
  • Gross floor area of 200,000 square metres across nine floors
  • Dimensions: 45 m tall, 65 m wide, 660 m long
  • 97 lifts and escalators
  • 20,000 tonnes of steel
  • 60,000 cubic metres of concrete
  • 350,000 tonnes weight
  • 2,500 parking spaces in the adjacent multi-storey car park
  • More information thesquaire.com
  • Facts about Caverion's solutions

  • 29,500 sprinkler heads
  • 380 km of pipes
  • 1,300 km of cables
  • 10 chillers with total output of 9,700 kW
  • 110 ventilation and air-conditioning units with total output of 1,050,000 cubic metres per hour
  • Approx. 100 equipment rooms
  • 1,000
    Caverion employees

    EUR 200M
    contract value approx.

    2008-2011
    lifespan